| Facility Projects Summary |
|
| We have constructed numerous wellsites for both sweet gas and sour gas service over the last six years. These sites vary, but typically include header systems, flare lines with flare stacks, RTU buildings, communication towers, pig launchers or receivers, line heaters, separator buildings, meter buildings and compressor packages. We also dismantle and modify existing facilities. |
 |
 |
 |
 |
Project: |
Fabrications of Meter Skid Packages |
| Client: |
Taqa North Ltd. |
| Location: |
Grande Prairie, AB |
| Description: |
Fabrication of 18 Meter Skid Packages for installation in the Chinchaga Area. |
| Date: |
Dec 08 – Jan 09 |
| |
|
|
 |
Project: |
Single wellsite with separator, line heater and flare stack |
| Client: |
Encana Oil and Gas |
| Location: |
Hythe, AB |
| Description: |
Install pilings, structural steel, set line heater, meter building, flare stack and associated piping. |
| Date: |
March 2008 |
| |
|
|
 |
Project: |
Single wellsite with separator |
| Client: |
Paramount Resources |
| Location: |
Crooked Creek, AB |
| Description: |
Install pilings, structural steel, set separator, tied associated piping into risers and pigging facilities. |
| Date: |
Feb 2008 |
| |
|
|
 |
Project: |
Compressor installation |
| Client: |
Conoco Phillips Canada |
| Location: |
Chicken |
| Description: |
Install piling, structural steel, set inlet separator/blow case, compressor, vent stack, 100 bbl tank with all associated piping including risers and 600m 6” YJ pipeline and header c/w pigging facilities. |
| Date: |
Jan 2008 |
| |
|
|
| |
Project: |
Wellsite, compressor, tank farm and vent stack installation |
| Client: |
Oban Energy |
| Location: |
Spirit River, AB |
| Description: |
Install pilings, structural steel, set 600hp compressor, inlet separator, vent stack and three 400 bbl tanks and associated piping. |
| Date: |
Dec 2007 |
| |
|
|
 |
Project: |
Compressor installation |
| Client: |
Conoco Phillips Canada |
| Location: |
Hinton, AB |
| Description: |
Install pilings, structural steel, set 700hp compressor, and vent stack. Built pipe rack and tied compressor and vent stack into existing wellsite piping. |
| Date: |
Dec 2007 |
| |
|
|
 |
Project: |
Sour wellsite tie-in in environmentally sensitive area |
| Client: |
Conoco Phillips Canada |
| Location: |
Hinton area, AB |
| Description: |
Install piling, structural steel, large line heater, set smaller line heater and pump skid for heat string, flare stack, 8” risers complete with pig sender, receiver including all associated piping. |
| Date: |
July 2007 |
| |
|
|
 |
Project: |
Single and multi well tie ins |
| Client: |
Burlington |
| Location: |
Elmworth |
| Description: |
Tie in twenty two single and multi pad sour gas well sites including pipelines in the Elmworth area during the summer and winter construction programs. Including piping, equipment, pilings and structural steel supports. |
| Date: |
Jun 06–May 07 |
| |
|
|
 |
Project: |
Compressor Installation |
| Client: |
Sahara Energy |
| Location: |
Gold Creek Area |
| Description: |
Install 600 hp compressor, dehy skid, and flare stack with knock out drum. Includes all pilings, supports, piping and equipment |
| Date: |
Mar 2007 |
| |
|
|
 |
Project: |
Well tie in |
| Client: |
Devon Canada Corp |
| Location: |
Grande Cache Cabin Creek & Smoky Areas |
| Description: |
Tie in five single and dual pad sour well sites in the Grande Cache area during the winter construction season. Including piping and piling installation, equipment hauling and setting, and structural steel supports. |
| Date: |
Feb 2007 |
| |
|
|
 |
Project: |
Well tie in and plant modification |
| Client: |
Gibraltar Exploration Ltd |
| Location: |
Grande Cache Prairie Creek Road |
| Description: |
Ten sweet gas tie ins and plant modifications including installation of owner supplied piping spools; predrill, supply and installation of piles; structural steel supports; and hauling and setting equipment. |
| Date: |
Jan 2007 |
| |
|
|
 |
Project: |
Well tie in with compressor installation |
| Client: |
Burlington |
| Location: |
West Haven |
| Description: |
Single well tie in including 400 hp compressor installation, associated piping, structural steel supports, pilings, and equipment. |
| Date: |
Oct 2006 |
| |
|
|
 |
Project: |
Wellsite construction |
| Client: |
Talisman Energy |
| Location: |
Narraway |
| Description: |
New installation of line heater, flare stack, pigging facility including associated piping, piling, predrilling for piles, testing and final grade on lease. |
| Date: |
Aug 2006 |
| |
|
|
 |
Project: |
Compressor Installation |
| Client: |
Bear Ridge Resources |
| Location: |
Gordondale |
| Description: |
Install 600 hp compressor and associated piping, piling, equipment and structural steel supports, and seven well sites including wet meter skids and associated piping, separator and tankage. |
| Date: |
Jul – Sep 2006 |
| |
|
|
 |
Project: |
Gas Plant Expansion |
| Client: |
Talisman Energy |
| Location: |
Musreau Plant, south of Grande Prairie |
| Description: |
Installation of a 1500 hp sales booster sweet gas compressor package, new exchanger, chiller and associated piping on Train B expansion. |
| Date: |
April – May, 06 |
| |
|
|
 |
Project: |
Decommission existing compressor and relocate new compressor |
| Client: |
Talisman Energy |
| Location: |
Hythe Area |
| Description: |
Decommission old compressor site, relocated a new 2 stage sour service 1200 hp compressor complete with inlet separator, silencer, flare stack, pipe rack and associated piping. |
| Date: |
April – May, 06 |