We have constructed numerous wellsites for both sweet gas and sour gas service over the last six years.  These sites vary, but typically include header systems, flare lines with flare stacks, RTU buildings, communication towers, pig launchers or receivers, line heaters, separator buildings, meter buildings and compressor packages. We also dismantle and modify existing facilities.
Project: West Doe Phase III Project
Client: Spectra Energy Transmission
Location: Dawson Creek, BC
Description: Sour gas plant expansion with design flow rate of 45MMscfd consisting of a horizontal inlet separator, amine plant, refrigeration plant, condensate stabilizer, acid gas compressor, VRU and recycle compressor. Includes all storage tanks, and waste disposal systems with all required piping and racking.
Date: Jul 09 – Nov 09
     
TAQA Project: Fabrications of Meter Skid Packages
Client: Taqa North Ltd.
Location: Grande Prairie, AB
Description: Fabrication of 18 Meter Skid Packages for installation in the Chinchaga Area.
Date: Dec 08 – Jan 09
     
Encana Project: Single wellsite with separator, line heater and flare stack
Client: Encana Oil and Gas
Location: Hythe, AB
Description: Install pilings, structural steel, set line heater, meter building, flare stack and associated piping.
Date: March 2008
     
Paramount Resources Project: Single wellsite with separator
Client: Paramount Resources
Location: Crooked Creek, AB
Description: Install pilings, structural steel, set separator,  tied associated piping into risers and pigging facilities.
Date: Feb 2008
     
ConocoPhillips Project: Compressor installation
Client: Conoco Phillips Canada
Location: Chicken
Description: Install piling, structural steel, set inlet separator/blow case, compressor, vent stack, 100 bbl tank with all associated piping including risers and 600m 6” YJ pipeline and header c/w pigging facilities.
Date: Jan 2008
     
  Project: Wellsite, compressor, tank farm and vent stack installation
Client: Oban Energy
Location: Spirit River, AB
Description: Install pilings, structural steel, set 600hp compressor, inlet separator, vent stack and three 400 bbl tanks and associated piping.
Date: Dec 2007
     
ConocoPhillips Project: Compressor installation
Client: Conoco Phillips Canada
Location: Hinton, AB
Description: Install pilings, structural steel, set 700hp compressor, and vent stack. Built pipe rack and tied compressor and vent stack into existing wellsite piping.
Date: Dec 2007
     
ConocoPhillips Project: Sour wellsite tie-in in environmentally sensitive area
Client: Conoco Phillips Canada
Location: Hinton area, AB
Description: Install piling, structural steel, large line heater, set smaller line heater and pump skid for heat string, flare stack, 8” risers complete with pig sender, receiver including all associated piping.
Date: July 2007
     
Burlington Resources Project: Single and multi well tie ins
Client: Burlington
Location: Elmworth
Description: Tie in twenty two single and multi pad sour gas well sites including pipelines in the Elmworth area during the summer and winter construction programs. Including piping, equipment, pilings and structural steel supports.
Date: Jun 06–May 07
     
Sahara Energy Ltd. Project: Compressor Installation
Client: Sahara Energy
Location: Gold Creek Area
Description: Install 600 hp compressor, dehy skid, and flare stack with knock out drum. Includes all pilings, supports, piping and equipment
Date: Mar 2007
     
Devon Project: Well tie in
Client: Devon Canada Corp
Location: Grande Cache Cabin Creek & Smoky Areas
Description: Tie in five single and dual pad sour well sites in the Grande Cache area during the winter construction season. Including piping and piling installation, equipment hauling and setting, and structural steel supports.
Date: Feb 2007
     
Gibraltar Project: Well tie in and plant modification
Client: Gibraltar Exploration Ltd
Location: Grande Cache Prairie Creek Road
Description: Ten sweet gas tie ins and plant modifications including installation of owner supplied piping spools; predrill, supply and installation of piles; structural steel supports; and hauling and setting equipment.
Date: Jan 2007
     
Burlington Resources Project: Well tie in with compressor installation
Client: Burlington
Location: West Haven
Description: Single well tie in including 400 hp compressor installation, associated piping, structural steel supports, pilings, and equipment.
Date: Oct 2006
     
Talisman Energy Project: Wellsite construction
Client: Talisman Energy
Location: Narraway
Description: New installation of line heater, flare stack, pigging facility including associated piping, piling, predrilling for piles, testing and final grade on lease.
Date: Aug 2006
     
Bear Ridge Resources Project: Compressor Installation
Client: Bear Ridge Resources
Location: Gordondale
Description: Install 600 hp compressor and associated piping, piling, equipment and structural steel supports, and seven well sites including wet meter skids and associated piping, separator and tankage.
Date: Jul – Sep 2006
     
Talisman Energy Project: Gas Plant Expansion
Client: Talisman Energy
Location: Musreau Plant, south of Grande Prairie
Description: Installation of a 1500 hp sales booster sweet gas compressor package, new exchanger, chiller and associated piping on Train B expansion.
Date: April – May, 06
     
Talisman Energy Project: Decommission existing compressor and relocate new compressor
Client: Talisman Energy
Location: Hythe Area
Description: Decommission old compressor site, relocated a new 2 stage sour service 1200 hp compressor complete with inlet separator, silencer, flare stack, pipe rack and associated piping.
Date: April – May, 06
 
 
     