Pipeline Division Heading
 
Pipeline Projects Summary  
spacer spacer spacer
Murphy Oil Corporation Project: Install 29,000m NEB 12” YJ sales line
Client: Murphy Oil and Gas Company
Location: BC/AB Border – Tupper Field
Description:

Install 12” YJ sales line pipeline to TransCanada line through swan and rare plant habitats which includes creek crossing and tie-ins

Date: Feb - Aug, 2008
     
Encana Project: Install 20,000m of 12” insulated and 18,000m of 4” YJ sales line
Client: EnCana Oil and Gas
Location: Tomslake, BC
Description:

Install 12” insulated and 4” YJ sales line with s-bend riser sites, z-bends, creek and road crossings.

Date: Feb – Jul, 2008
     
Talisman Energy Project: Install 75,000m of 3 & 6” insulated pipe with river and creek crossings
Client: Talisman Energy
Location: South of Grande Cache
Description: Install 75,000m of multi line 3 & 6” insulated pipe with two major river, several major creek, two highway crossings, ESD Stations and plant tie-ins.
Date: June 2007
     
Encana Project: Install 8000m 12” insulated sales line with creek crossings
Client: EnCana Oil and Gas
Location: BC/AB Border – Tupper Field
Description:

Install 12” insulated sales line pipelines which includes creek crossing and tie-ins

Date: Jan – May, 2007
     
Burlington Resources Project: Gas & Oil Gathering system
Client: Burlington Resources
Location: Elmworth area
Description: Install 3” - 8” insulated and YJ pipe into wellsite and riser tie-ins
Date: Jun 06 - May 07
     
Gibraltar Project: Install 50 km of 6 & 8” sales line for tie-ins and facility projects
Client: Gibraltar Exploration Ltd.
Location: Grande Cache (Prairie Creek Road)
Description: Install 50 km of 6 & 8” sales line with major creek crossing, small compressor and heater sites
Date: Jan – May, 2007
     
Devon Project: Install 7500m NPS 4 for well tie-in
Client: Devon Canada Corp
Location: Cabin Creek & Smoky Areas
Description:

Installed 7500m NPS 4 for 5 well tie-ins which included highway and creek crossings

Date: Feb 2007
     
Burlington Resources Project: 14 inch River Crossing
Client: Burlington Resources Canada
Location: Kakwa River
Description: Assisted Mears Canada in Crossing of Wapiti River.
Date: November 2006
     
Bear Ridge Resoucres Project: Install 15,000m NPS 4 fibre spar flex pipe and steel pipe
Client: Bear Ridge Resources
Location: Gordondale
Description:

Install 15,000m NPS of Fibre spar Flex pipe and steel pipe for multiple well tie-ins on sensitive farm land.

Date: July – Sep, 2006
     
  Project: Install 300m of NPS 3 with risers.
Client: Centennial Petroleum Company Ltd.
Location: Weyerhaeuser Road KM 101
Description: Installed 300m of NPS 3 pipe with S-bend risers at each end.
Date: Apr 2006
     
Andarko Canada Corporation Project: Gas & Oil Gathering Systems
Client: Anadarko Canada Corporation
Location:

Spring Lake Area

Description: Install various dual and single line projects from 3 – 6” insulated and YJ pipe into wellsite and riser tie ins.
Date: Jan - Mar, 2006
     
Burlington Resources Project: Install 7700m of NPS 4 insulated pipe.
Client: Burlington Resources
Location: Two Lakes Area
Description: Completed several NPS 4 insulated well tie-ins projects in the Two Lakes area totaling 7700m.
Date: Feb & Mar, 2006
     
Temple Energy Project: Construct a 22 km gas gathering system and multiple well tie-in program.
Client: Temple Energy Ltd.
Location: Musreau Lake area, south of Grande Prairie, AB
Description: Construction of a 22 km NPS 4 gas gathering system and multiple well tie-in program, including a 8.5 km NPS 6 sales line.
Date: Mar – Apr, 2006
     
NAL Project:

Install 6500 m of NPS 3 YJ pipe for an oil gathering system.

Client: NAL Resources
Location: Sturgeon Heights
Description: Installed 6500 m NPS 3 for a 10 well gathering system.
Date: Feb 2006
     
Prospex Project: Construct 15 kms of NPS 8 pipeline and mid-point risers.
Client: ProspEx Resources Ltd.
Location: Kakwa area, south of Grande Prairie, AB
Description:

Construction of 15 kms of NPS 8 pipeline with mid-point risers.  Project located in a very congested and active gas field with numerous pipeline crossings.  Challenges of the project included paralleling several operating pipelines with a very narrow R/W, muskeg, rock and creek crossings all during winter conditions.

Date: Feb – Mar, 2006
     
Talisman Energy Project: S-bend and vertical riser installations.
Client: Talisman Energy
Location: South of Grande Prairie on Weyerhaeuser Road
Description:

Install three NPS 6 X 4 vertical risers and two NPS 6 S-bend risers at five different locations during a line outage.

Date: Jan 2006
     
Arc Project: Install 9000m of NPS 4 pipe and 2” plastic pipe in a common ditch.
Client: ARC Resources
Location: Rolla, B.C.
Description:

Installed 9000m of NPS 4 pipe and 2” plastic pipe in a common ditch for a six well tie-in program on farm land

Date: Jan 2006
     
Primewest Energy Project: Integrity digs on NPS 4 pipe, pipe replacement and re-testing of 2300m.
Client: Primewest Energy
Location: Saddle Hills Area
Description: Excavate and clean pipe for inspection, replaced pipe sections and re-tested 2300m of pipe.
Date: Jan 2006
     
Paramount Resources Project: Install 3000m of triple pipeline in a common ditch.
Client: Paramount Resources
Location: Moon Shine Lake Area
Description:

Install 3000m each of NPS 6 and NPS 3 YJ coated pipe and 2” plastic pipe in a common ditch.

Date: Jan 2006
     
Anadarko Project: Install 1800 m of NPS 4 pipeline.
Client: Anadarko Canada Corporation
Location: Goodfare Area, AB
Description: Install 1800m of NPS 4 YJ coated pipe and tied into header piping.
Date: Jan 2006
     
  Project: Install 2400 m NPS 4 pipeline with a hot tie-in.
Client: Veteran Resources Ltd.
Location: Spirit River, AB
Description: Install 2000m of dual NPS 4 YJ coated pipe crossing farmland.  Install 400m of NPS 4 pipeline with a hot tie-in.
Date: Dec 2005
 
 
     