| Pipeline Projects Summary |
|
 |
 |
 |
 |
Project: |
Install 29,000m NEB 12” YJ sales line |
| Client: |
Murphy Oil and Gas Company |
| Location: |
BC/AB Border – Tupper Field |
| Description: |
Install 12” YJ sales line pipeline to TransCanada line through swan and rare plant habitats which includes creek crossing and tie-ins |
| Date: |
Feb - Aug, 2008 |
| |
|
|
 |
Project: |
Install 20,000m of 12” insulated and 18,000m of 4” YJ sales line |
| Client: |
EnCana Oil and Gas |
| Location: |
Tomslake, BC |
| Description: |
Install 12” insulated and 4” YJ sales line with s-bend riser sites, z-bends, creek and road crossings. |
| Date: |
Feb – Jul, 2008 |
| |
|
|
 |
Project: |
Install 75,000m of 3 & 6” insulated pipe with river and creek crossings |
| Client: |
Talisman Energy |
| Location: |
South of Grande Cache |
| Description: |
Install 75,000m of multi line 3 & 6” insulated pipe with two major river, several major creek, two highway crossings, ESD Stations and plant tie-ins. |
| Date: |
June 2007 |
| |
|
|
 |
Project: |
Install 8000m 12” insulated sales line with creek crossings |
| Client: |
EnCana Oil and Gas |
| Location: |
BC/AB Border – Tupper Field |
| Description: |
Install 12” insulated sales line pipelines which includes creek crossing and tie-ins |
| Date: |
Jan – May, 2007 |
| |
|
|
 |
Project: |
Gas & Oil Gathering system |
| Client: |
Burlington Resources |
| Location: |
Elmworth area |
| Description: |
Install 3” - 8” insulated and YJ pipe into wellsite and riser tie-ins |
| Date: |
Jun 06 - May 07 |
| |
|
|
 |
Project: |
Install 50 km of 6 & 8” sales line for tie-ins and facility projects |
| Client: |
Gibraltar Exploration Ltd. |
| Location: |
Grande Cache (Prairie Creek Road) |
| Description: |
Install 50 km of 6 & 8” sales line with major creek crossing, small compressor and heater sites |
| Date: |
Jan – May, 2007 |
| |
|
|
 |
Project: |
Install 7500m NPS 4 for well tie-in |
| Client: |
Devon Canada Corp |
| Location: |
Cabin Creek & Smoky Areas |
| Description: |
Installed 7500m NPS 4 for 5 well tie-ins which included highway and creek crossings |
| Date: |
Feb 2007 |
| |
|
|
 |
Project: |
14 inch River Crossing |
| Client: |
Burlington Resources Canada |
| Location: |
Kakwa River |
| Description: |
Assisted Mears Canada in Crossing of Wapiti River. |
| Date: |
November 2006 |
| |
|
|
 |
Project: |
Install 15,000m NPS 4 fibre spar flex pipe and steel pipe |
| Client: |
Bear Ridge Resources |
| Location: |
Gordondale |
| Description: |
Install 15,000m NPS of Fibre spar Flex pipe and steel pipe for multiple well tie-ins on sensitive farm land. |
| Date: |
July – Sep, 2006 |
| |
|
|
| |
Project: |
Install 300m of NPS 3 with risers. |
| Client: |
Centennial Petroleum Company Ltd. |
| Location: |
Weyerhaeuser Road KM 101 |
| Description: |
Installed 300m of NPS 3 pipe with S-bend risers at each end. |
| Date: |
Apr 2006 |
| |
|
|
 |
Project: |
Gas & Oil Gathering Systems |
| Client: |
Anadarko Canada Corporation |
| Location: |
Spring Lake Area |
| Description: |
Install various dual and single line projects from 3 – 6” insulated and YJ pipe into wellsite and riser tie ins. |
| Date: |
Jan - Mar, 2006 |
| |
|
|
 |
Project: |
Install 7700m of NPS 4 insulated pipe. |
| Client: |
Burlington Resources |
| Location: |
Two Lakes Area |
| Description: |
Completed several NPS 4 insulated well tie-ins projects in the Two Lakes area totaling 7700m. |
| Date: |
Feb & Mar, 2006 |
| |
|
|
 |
Project: |
Construct a 22 km gas gathering system and multiple well tie-in program. |
| Client: |
Temple Energy Ltd. |
| Location: |
Musreau Lake area, south of Grande Prairie, AB |
| Description: |
Construction of a 22 km NPS 4 gas gathering system and multiple well tie-in program, including a 8.5 km NPS 6 sales line. |
| Date: |
Mar – Apr, 2006 |
| |
|
|
 |
Project: |
Install 6500 m of NPS 3 YJ pipe for an oil gathering system. |
| Client: |
NAL Resources |
| Location: |
Sturgeon Heights |
| Description: |
Installed 6500 m NPS 3 for a 10 well gathering system. |
| Date: |
Feb 2006 |
| |
|
|
 |
Project: |
Construct 15 kms of NPS 8 pipeline and mid-point risers. |
| Client: |
ProspEx Resources Ltd. |
| Location: |
Kakwa area, south of Grande Prairie, AB |
| Description: |
Construction of 15 kms of NPS 8 pipeline with mid-point risers. Project located in a very congested and active gas field with numerous pipeline crossings. Challenges of the project included paralleling several operating pipelines with a very narrow R/W, muskeg, rock and creek crossings all during winter conditions. |
| Date: |
Feb – Mar, 2006 |
| |
|
|
 |
Project: |
S-bend and vertical riser installations. |
| Client: |
Talisman Energy |
| Location: |
South of Grande Prairie on Weyerhaeuser Road |
| Description: |
Install three NPS 6 X 4 vertical risers and two NPS 6 S-bend risers at five different locations during a line outage. |
| Date: |
Jan 2006 |
| |
|
|
 |
Project: |
Install 9000m of NPS 4 pipe and 2” plastic pipe in a common ditch. |
| Client: |
ARC Resources |
| Location: |
Rolla, B.C. |
| Description: |
Installed 9000m of NPS 4 pipe and 2” plastic pipe in a common ditch for a six well tie-in program on farm land |
| Date: |
Jan 2006 |
| |
|
|
 |
Project: |
Integrity digs on NPS 4 pipe, pipe replacement and re-testing of 2300m. |
| Client: |
Primewest Energy |
| Location: |
Saddle Hills Area |
| Description: |
Excavate and clean pipe for inspection, replaced pipe sections and re-tested 2300m of pipe. |
| Date: |
Jan 2006 |
| |
|
|
 |
Project: |
Install 3000m of triple pipeline in a common ditch. |
| Client: |
Paramount Resources |
| Location: |
Moon Shine Lake Area |
| Description: |
Install 3000m each of NPS 6 and NPS 3 YJ coated pipe and 2” plastic pipe in a common ditch. |
| Date: |
Jan 2006 |
| |
|
|
 |
Project: |
Install 1800 m of NPS 4 pipeline. |
| Client: |
Anadarko Canada Corporation |
| Location: |
Goodfare Area, AB |
| Description: |
Install 1800m of NPS 4 YJ coated pipe and tied into header piping. |
| Date: |
Jan 2006 |
| |
|
|
| |
Project: |
Install 2400 m NPS 4 pipeline with a hot tie-in. |
| Client: |
Veteran Resources Ltd. |
| Location: |
Spirit River, AB |
| Description: |
Install 2000m of dual NPS 4 YJ coated pipe crossing farmland. Install 400m of NPS 4 pipeline with a hot tie-in. |
| Date: |
Dec 2005 |